Found 584 Products For "bzb vocs treatment system"
車体の自動工場自動塗る機械のための自動ペイント ライン
Car Body Automatic Painting Line For Auto Factory Auto Painting Machine. Maint Process: workpiece paint pre-treatment--cathodic electrodeposition primer coating-- PVC glue--weld seam sealing-- middle coating--surface coating and drying-- check and repair process--and complete coating of paint material --products inspection work. Some necessary main Equipment for some main process: Systems Equipment Details Pre-treamment 1. Flood wash equipment 2. Degrease equipment 3.
断熱自動車塗装ライン
Auto Lighting Inspection Tunnel for Car Painting Line Automatic Painting Line Equipments Maint Process: workpiece paint pre-treatment--cathodic electrodeposition primer coating-- PVC glue--weld seam sealing-- middle coating--surface coating and drying-- check and repair process--and complete coating of paint material --products inspection work. Some necessary main Equipment for some main process: Systems Equipment Details Pre-treamment 1. Flood wash equipment 2. Degrease
自動自動ペイント ライン自動車ペイント ラインを続けなさい
Continue Automatic Auto Painting Line Automotive Paint Line for Sales Maint Process: workpiece paint pre-treatment--cathodic electrodeposition primer coating-- PVC glue--weld seam sealing-- middle coating--surface coating and drying-- check and repair process--and complete coating of paint material --products inspection work. Some necessary main Equipment for some main process: Systems Equipment Details Pre-treamment 1. Flood wash equipment 2. Degrease equipment 3. Electropho
コーティング ライン システムの自動ぬれたスプレー式塗料 ライン自動スプレー式塗料機械
Automatic Wet Spray Paint Line Automatic Spray Painting Machine On Coating Line System Maint Process: workpiece paint pre-treatment--cathodic electrodeposition primer coating-- PVC glue--weld seam sealing-- middle coating--surface coating and drying-- check and repair process--and complete coating of paint material --products inspection work. Some necessary main Equipment for some main process: Systems Equipment Details Pre-treamment 1. Flood wash equipment 2. Degrease
PLCは重慶の風力タワーのための風力タワーのペンキ ブースを制御します
Wind Turbine Towers Paint Booth For Chongqing Wind Tower Manufacturer 1.Customized Room body Color & Size. 2.Original Italian RIELLO Burner, Hot wind recycling system with SUS304 heat exchanger. 3. "BELIMO" automatic electric & pneumatic damper. 4. Unique big area air filtering system & filtering rate reaches 98%. 5. Big air capacity & low noise centrifugal blower fan adopts Siemens Technology. 6. LED lighting system with high illumination and long using life. 7. Insula
Audi車のための自動スプレー式塗料 ブースは装置のガレージのペンキ ブースを塗る
Auto Spray Paint Booth CE Car Paint Equipment Factory On Sale Garage Paint Booth Features Two 4kW fans can offer the supply air volume of up to 25000m3/h. Moreover, an eco-friendly cabinet is adopted. Inside it, there is a 7.5kW exhaust fan. In this way, the air exhaust can be provided with eco-friendly function, and the air capacity can reach 20,000m3/h. It is also conducive to the discharging of paint mist and the filtering of waste gas. Then, the spray booth obtains the
バス トラックの静電気の産業スプレー・ブース
Manufacturer Bus Spray Booth/Truck Paint Booth/ Industrial Painting Booth Bus Paint Booth Industrial spray booths We can offer an extensive range of standard and bespoke dry-filter and water wash spray booths, ovens and curing systems, as well as offering complete turnkey systems which can include pre-treatment, portable extraction, turntables and component conveyor systems. All of our booths are built to the best standards, from the highest grade materials. Designed to
発掘の60um産業ペイント ラインを焼く地上のディーゼル トラックの容器
Container Spray/Baking Booth Dig The Ground Design Hot Sale Diesel Truck spray booth This is Customer-made Industry Spray Booth base on customer's require.Workshop space. Produce Capacity.Contact us if you have require.we can design to full fill your require. The Follow project is for Yangzhou Big Painting Line Project Some necessary main Equipment for some main process: Systems Equipment Details Pre-treamment 1. Flood wash equipment 2. Degrease equipment 3. Electrophoresis
岩綿PU 2.5mの微細なディーゼル産業ペイント ライン
Wind Blade Painting Line Project Hot Sale Diesel Truck spray booth Factory direct Sale Functional and structural requirements 1. Chamber body: use rock wool insulation board, and set up a folding movable partition wall at 43m in the length direction of No. 3 and 4 drying rooms. The material of the partition wall is the same as that of the side panels. 2. Gate: Set up sliding-board industrial lift gates at both ends, without thresholds at the bottom of the gate. 3. The layout